Page Loading

HOW WE HELP

We accelerate well delivery and maximize well lifespan for energy operators through physics-based modeling and drilling expertise

AWE offers constant performance improvement for the client by leveraging the extensive experience of our engineering team and DrillScan® digital solutions.

AWE H&P

WE TAILOR EACH SERVICE TO ALIGN WITH THE SPECIFIC DESIRED OUTCOME OF OUR CLIENTS

We offer a range of specific outcomes for our clients through our three pillars of service: Real-Time Advisory, Well Delivery, and Tailored Analysis. The pillars of service can also be combined with many other Helmerich & Payne technology offerings, such as the Bit Guidance System and AutoSlide® technology, to unlock further value for our clients.

  • Tailored Analysis

    Remote Operations CenterMonitor live operation to maximize drilling efficiency and provide alerts to avoid events that may result in excessive non-productive time.

  • Well Delivery

    Our skilled engineers enhance your well delivery process, ensuring compliance with safety and regulatory requirements

  • Real-Time Advisory

    Custom engineering studies to meet the needs of the client, with a focus on delivering better outcomes

WHO WE ARE

We are a drilling engineering and R&D team renowned for pioneering the development and implementation of industry-leading physics-based models.

Drilling Digital Solutions

Enhance drilling engineer performance with precise digital solutions

Advanced Well Engineering

Premium engineering services to maximize the efficiency of your well delivery process

Research & Development

Continual R&D development to improve models for H&P rigs and global clients

Access AWE Resources Talk to An Expert

  • Field Proven Execution

    Operator Challenge: Mitigate costly motor failures while drilling two-mile unconventional lateral sections

    Outcome: Saved 1.75 days and 1 lateral BHA equating to > $105,000 per well

    Download Case Study

  • Head-to-Head Comparison

    Operator Challenge: Avoid unplanned bha trips while drilling in an extreme environment

    Outcome: Saved 57 drilling hours

    Download Case Study

  • In-Depth Pre-Analysis

    Operator Challenge: Deploy a lighter well architecture for upcoming drilling campaign

    Outcome: Operator projected to save roughly $4M per well,

    Download Case Study

Ready to accelerate your well delivery & maximize your well lifespan?


✅ Sign up to have the Advanced Well Engineering E-Brochure

✅ Product fact sheet

✅ Most recent case study delivered to you immediately.